Application for Qualitative Control Waiver for Stormwater Management Tivoly Eco-Village Mass Grading

Plans Review and Inspections Section, Room 227
3001 Druid Park Drive, Baltimore, MD 21215
Baltimore City Department of Public Works
DPW Logo

Description

The Department of Public Works (DPW) is accepting public review and comments on this project’s application for a qualitative control waiver for stormwater management. 

This project proposes to disturb 7.68 acres [or 334,626 square feet] of land and decrease the amount of impervious area by 6.15 acres [or 267,894 square feet]. The project will consist of demolition of existing impervious surfaces, demolish site features such as sidewalk and roadways, curb & gutter and to establish site grading necessary to facilitate future development.  To meet the minimum design requirements for stormwater management,  the project proposes to remove  6.15 acres [or 267,894 square feet] of existing impervious area. 

The Applicant has applied for a Qualitative Control Waiver, in accordance with City Code Article 7, Division II, § 23-2 . The existing (pre-demolition) conditions of the project meets the criteria for redevelopment.  So, the qualitative control requirements will be met through impervious area reduction and quantitative control will not be required. 

Applicant

Affordable Homes & Communities
1501 Saint Paul Street
Baltimore, MD 21202
Maryclaire.davis@ahcinc.com

Project ID

BCNR-12147  

Watershed(s)

Baltimore Harbor

Project Location 

2700 Tivoly Avenue, Baltimore, MD 21218  

For More Information

To obtain information or send comments specifically about this qualitative control waiver request, please contact:

Michael Savage
DPW Plans Review and Inspections Section, Room 227
3001 Druid Park Drive, Baltimore, MD 21215

By phone at (410-396-0732) or by e-mail to dpw.plansreview@baltimorecity.gov.  Comments received after 4:30 PM, October 28, 2026  will not be considered. 

Any further notices about actions on this application will be posted on the DPW’s website. 

Answers to Common Questions

Why am I getting this notice?

The referenced construction project is proposed on a property next to your property. The DPW-  Plans Review and Inspections Section is required by law to notify you.

What is a qualitative control waiver?​

By law, land-disturbing construction activities require stormwater management, specifically qualitative control, which is a system of vegetative, structural, and nonstructural practices, natural areas, environmental site design practices, stormwater management measures, and any other structure that reduces or eliminates pollutants that might otherwise be carried by surface runoff.  These requirements may be waived based on the justifications provided in the public notice. 

Is this waiver legal?

Yes, under City Code Article 7, Division II, § 23-2. 

Does this have anything to do with the Maryland Stormwater Fee?

No. The fee that property owners have to pay is not related to the stormwater management rules that developers have to follow.

Will it affect my property?

The waiver, if approved, should not affect you or your property after the construction is completed.   

Will it cost me anything?

No. Any fees associated with this waiver will be paid by the Applicant listed on front page of this notice.

Do I have to do anything?

Noaction is required, but you can send comments or inquiries to the contacts listed on the front of this notice. Please limit comments or inquiries to the subject of stormwater management. 

How do I find out additional information about the project itself?

The Applicant can provide additional information about the project, including estimated construction schedules or traffic impacts during construction.  See Applicant Information section for the Applicant’s contact information. 

Contact Person
Michael Savage
dpw.plansreview@baltimorecity.gov